2003 Phipps Bridge Road Traffic Calming Scheme Leave a reply The traffic calming measures in Phipps Bridge Road were possibly implemented in late 2003/early 2004, based on this leaflet. Leaflet requested replies by 14th July 2003. Map on reverse side of leaflet showed where measures were to be implemented. Share this: Click to share on X (Opens in new window) X Click to email a link to a friend (Opens in new window) Email Click to print (Opens in new window) Print Like Loading...